Full bathroom rip out and update to a modern finish.
Full rip out, wall and floor tiled and with bath and toilet move to open up the room.
Ensuite rip out, with wet room and underfloor heating installed, suite to give as much space to the room as possible and fully tiled, along side Mira digital shower.
MEDIUM / LARGE BATHROOM RIP OUT AND REBUILD